Renovation of the main sewage collector in Tallinn

CASE

During the renovation project of Tallinn's main sewage collector ordered by AS Tallinna Vesi our client Lemminkäinen was involved. In order to ensure free access to the damaged sewage pipeline section a mobile pumping station solution was necessary to employ in order to provide a continuous bypass of the fecal sewerage and very heavy flood overflow bypass thus preventing the reconstruction section from floods.

EQUIPMENT

2 pcs. Pioneer 200 SL
1 pc. Pioneer 300 SM
1 pc. Hidrostal H12K
1 pc. BBA BA 100
100 m D200 pressure hoses
70 m D600 steel pipeline

UPRENT SOLUTION

The task for UPRENT was to immediately deliver the pumping stations to the construction site as there was no time left for detailed project design and technical solution, according to client. The mobilization of the equipment was done with no hesitation. At the initial stage pipelines were installed and pumps weighing 9 tons were moved at the installation process of the pumping system. The pumping systems were modified various times during the project in order to adjust it to the client’s specifications and changing tasks.

PROJECT IN NUMBERS

24 months of the provided service
12 employees involved
3 vehicles employed
3 lifting devices used during the installation and disassembly
70 000 000 m³ sewage bypassed
60 t total weight of the pumping system

Year:
2014
Location:
Tallinn, Estonia
Number of employees:
12
Project duration:
2 years